Buyers Meeting Point procurement by Kelly Barner

RSS Feed Buyers Meeting Point procurement by Kelly Barner LinkedIn Buyers Meeting Point procurement Kelly Barner twitter Buyers Meeting Point procurement Kelly Barner scribd Buyers Meeting Point procurement Kelly Barnerblogtalkradio Buyers Meeting Point procurement Kelly Barner podcast BMP Radioyoutube Buyers Meeting Point procurement Kelly Barnersoundcloud Buyers Meeting Point procurement Kelly Barner

Book Review: The POD Model

Book Review: The POD Model

Buyers and suppliers, they make the commercial world go round.

-        The POD Model, p. 1

 

The POD Model: The mutually-beneficial model for buyers and suppliers which enables an increase in profit through commercial collaboration by Michael Robertson strives to do something that we need a whole lot more of in procurement. It provides a framework for combining our philosophical objectives as collaborators and innovators with the inescapable need to measure our results.

Robertson looks at the messy reality of buyer supplier relations and breaks them down to a few major issues: cost, risk, flexibility, and incentives for mutual gain. He then looks to find a way to factor those into contracts in such a way that no one party benefits at the cost or loss of the other.

Continue reading
2067 Hits
0 Comments

Savings from Tesla’s Powerwall? I don’t think so…at least not in the US

Savings from Tesla’s Powerwall? I don’t think so…at least not in the US

The long term plan of Tesla CEO Elon Musk to establish a widespread energy solution might finally be coming to fruition. After the public adoption of his electric cars, the Tesla Model S and Roadster, Musk has now moved on to the release of both a battery for residential use and a larger battery for industrial application, called the Powerwall and Powerpack, respectively.

Powerwall is a rechargeable lithium-ion battery designed for energy storage for residential consumers. According to Tesla it is primarily designed “for load shifting, backup power and self-consumption of solar power generation.” Two variations of the Powerwall have been released: a 10 kWh model which is listed at $3,500 and a 7 kWh model listed at $3,000. Their big brother, the Powerpack, is expected to be released in 100 kWh capacity blocks and is designed to be scalable from 500 kWh to 10 MWh.

Continue reading
4025 Hits
0 Comments

Is the Should Cost Model Obsolete?

Is the Should Cost Model Obsolete?

Q: Does anybody still use the “should-cost” model?

A: Yes, and if they don’t, they should start.

 

Continue reading
1729 Hits
0 Comments